Bus transport diversion on U viaduktu street

Ended event ?
zavřít
Co je Ended event?
Aktualizováno:
from
 do
78
N95

Due to to the road surface reconstruction, traffic on U viaduktu street in Chrlice is limited from 5:00 on Wednesday 27 March 2024 till 22:30 on Friday 26 April 2024. The street is passable only in the direction from Tuřany to Chrlice.

 

Image
autobus přeškrtnutý

 Bus line 78 towards Židenice, nádraží between the stops Chrlické náměstí and Hanácká is diverted through V rejích and Rolencova streets.

• The line therefore skips the stops U viaduktu and Chrlická.

• On the diversion route, the line serves the stops V rejích, Holásky, Rolencova and Holásecká.

• The stop Hanácká is served on Špirkova street (together with line 48).

 

Image
autobus přeškrtnutý

 Bus line N95 towards Kamenný vrch between the stops Chrlické náměstí and Chrlická is diverted through V rejích and Rolencova streets and via Tuřany loop.

• The line therefore skips the stop U viaduktu.

• On the diversion route, the line serves the stops V rejích, Holásky, Rolencova, Holásecká and Tuřany, smyčka.

 

Image
info

 Towards Chrlice, lines 78 and N95 folllow their regular route through U viaduktu street.

 

Image
zastávka přeškrtnutá

 The stop U viaduktu towards Chrlice is relocated approximately 320 meters forwards. 

 

Image
soubor ke stažení

 Diversion scheme – download

Image
soubor ke stažení

 Timetables of affected lines are available in the section Timetables.